Operating procedure

You can invite a specialist dlya consultation and calculation of the cost of work for FREE!​

Also, professional designers visit the object for FREE!!!

 

INTERIOR DESIGN DEVELOPMENT

  • It is necessary to conclude agreement for the development of an interior design project. This can be done at our office or directly at the facility by filling out the form Conclude an agreement and start work

  • After the conclusion of the contract and the advance payment in our office, or when the contract is approved by e-mail, our employee at the agreed time leaves for the object for measurements and photography.

  • After the actual drawing of measurements in real scale, you meet with the designer to fill out the terms of reference and discuss your wishes and preferences (in terms of functionality, styles, shapes, colors, etc.).

  • Next, the workflow for creating your interior begins - previously each stage is discussed with you, performed in 2-4 options and offered to you for approval. If necessary, changes are made until you approve all the steps.

  • After completion of all stages, the final act on the provision of services is signed. At this point, the contract for the development of a design project is considered completed.

Term: 1-2 months.

 

 

Calculation of the estimate

  • Upon completion of the design work, the project automatically goes to the estimate department, where a contract for repair and construction work is drawn up , including a detailed estimate for work and materials and a work schedule The calculation of the estimate for our design project is free of charge.

  • If the customer wishes, before the conclusion of the contract, all of its clauses are subject to discussion and change - working conditions and payment, cost of work and materials, terms of work, etc.

  • After agreeing the contract, we proceed to the repair of the premises and, if necessary, to the development of engineering projects.

Timeframe: 1-2 days.

 

 

DEVELOPMENT OF ENGINEERING PROJECTS

 

If necessary, before performing construction work, we develop engineering projects.

  • Electrical equipment project (EA stage)

  • Heating project (stage O)

  • Air conditioning and ventilation project (stage B and K)

  • Water supply and sewerage project (VC stage)

  • Project on low-voltage systems (SS stage - Internet, telephone, television, intercom)

  • Home theater project (DC stage)

  • Fire and security alarm project

  • CCTV project (OT stage)

  • Multiroom project (SM stage)

  • Built-in vacuum cleaner project (IP stage)

  • Lighting control project (LA stage)

Deadline: 1 week.

 

 

PERFORMANCE OF REPAIR AND CONSTRUCTION WORKS

  • It is necessary to conclude a contract for repair and construction work.

  • The amount and procedure for payment for general construction ("rough") materials is determined by the individual conditions specified in the contract. Most often this is an advance payment of 20%, the remaining amount for a certain time.

  • Payment for the work performed is carried out in stages. Usually 1-2 times a month, the foreman closes the certificates of work performed (in accordance with the estimate), and if you have no justified claims to the quality or volume of the work performed, you pay for this certificate. In case of claims - you do not pay for these works until all comments are eliminated.

  • During the repair, technical control, quality control and compliance with SNIPs is carried out by a foreman and an independent specialist "Technical Supervision". The foreman appears at the facility every other day, and closer to the delivery of the facility - every day. Technical supervision makes control once a week.

  • If there is an additional agreement on design supervision, the designer periodically, usually once a week, visits the facility, advises the foreman, workers and you during the repair, if necessary, promptly makes changes to the project and controls compliance of the work performed with the approved project.

  • The purchase of finishing ("finishing") materials can be made both independently and through our supply department.

  • After completion of all stages of the estimate, the final act on the provision of services is signed. At this point, the contract for repair and construction work is considered completed.

Term: 2-6 months.
 